Refinery

Watch the video
Size (sq m)
14,000
Size (sq ft)
150,000
Type
Offices
Availability
Now

plug into a new kind of life science workspace

A new 150,000 SQF lab enabled building

Serviced laboratory space with shared facilities from 700 SQF

Larger turnkey CL2 laboratory space available from 5,000 SQF up to whole floors

Target: EPC A u0026 BREEAM Very Good

19 car parking spaces with EV charging points

Centre of West London Life Science cluster

Available 2024

Enquire now

150,000 SQF of rnlab enabled space

u003ch2u003eREFINERY AT A GLANCEu003c/h2u003ernu003culu003ern tu003cliu003e19 car parking spaces with EV charging pointsu003c/liu003ern tu003cliu003e24hr Conciergeu003c/liu003ern tu003cliu003e4,000 SQF Café / Restaurantu003c/liu003ern tu003cliu003e5,500 SQF Business Lounge and Atrium with coffee baru003c/liu003ern tu003cliu003e1,200 SQF Event Studio and Presentation Suiteu003c/liu003ern tu003cliu003eRooftop Clubroomu003c/liu003ern tu003cliu003eDedicated ARC West London APPu003c/liu003ern tu003cliu003eFully accessed raised floorsu003c/liu003ern tu003cliu003e4 x 13-person passenger liftsu003c/liu003ern tu003cliu003eSecure, ride-in garage for 182 bikes (12 short stay visitor spaces externally)u003c/liu003ern tu003cliu003e14 executive showersu003c/liu003ern tu003cliu003e182 Storage lockersu003c/liu003ern tu003cliu003eDrying Roomsu003c/liu003ernu003c/ulu003e

u003ch2u003eu003cstrongu003eBUILT WITH SUSTAINABILITY IN MINDu003c/strongu003eu003c/h2u003ernu003culu003ern tu003cliu003eTargeting BREEAM Very Goodu003c/liu003ern tu003cliu003eTargeting EPC Au003c/liu003ern tu003cliu003e3,950 sq. m of gardens and green spaceu003c/liu003ern tu003cliu003eBio-diverse green roofs with beehives to aid pollinationu003c/liu003ern tu003cliu003eSecure, ride-in garage for 182 bikesu003c/liu003ern tu003cliu003eDaylight sensing LED light fittings to office floorsu003c/liu003ern tu003cliu003eInsulation to achieve standard of Zero Ozone Depletion Potentialu003c/liu003ern tu003cliu003eUp to 30% recycled content in the glass used for the production of glazed unitsu003c/liu003ern tu003cliu003eBMS energy monitoring will highlight any source of excessive energy consumption within the buildingu003c/liu003ern tu003cliu003ePV array at roof level circa 200 sq mu003c/liu003ern tu003cliu003eBuilding services heating system is not reliant fossil fuels being all electricu003c/liu003ern tu003cliu003eRainwater harvesting for use externallyu003c/liu003ern tu003cliu003eUp to 93% recycled content used in steel fabricationu003c/liu003ern tu003cliu003eBetween 40-75% recycled content within aluminium curtain walling components and up to 59% in façade materialsu003c/liu003ern tu003cliu003eHigh efficiency chiller plant for chilled water, with heat recovery to LTHu003c/liu003ern tu003cliu003eReduction or diversion of waste from landfillu003c/liu003ern tu003cliu003eAll timber will be FSCu003c/liu003ern tu003cliu003eLondon Urban Green Factor LUGF score of 0.21u003c/liu003ernu003c/ulu003e

Floor Plans

  • Ground floor
  • Floor 1
  • Floors 2, 3 u0026amp; 4
  • Floor 5
Ground floor
Unit Sq m Sq ft
A – Reception and ARC Club 514 5,538
B – Event Studio and Presentation Suite 109 1,171
C – Motherlabs 1,168 12,574
D – Cafe Scientifique 365 3,924
Total NIA 2,256 24,283
Floor 1
Unit Sq m Sq ft
Lab / Office space 2,478 26,673
Floors 2, 3 u0026amp; 4
Unit Sq m Sq ft
Floor 2 lab/office space 2,481 26,705
Floor 3 lab/office space 2,481 26,705
Floor 4 lab/office space 2,482 26,727
Floor 5
Unit Sq m Sq ft
Lab / Office space 1,349 14,521

Leasing

2121_Apr_Adapt_WR_ed_282